Home / Staff / Academic Staff /

Prof. Dr. Eng. Encho Dulevski

Faculty of Transportation Engineering, Department of road construction and transport facilities - Lecturer (retired)

Prof. Dr. Eng. Encho Dulevski
Office Room B12
Phone 9635245/508
E-mail emd_fce@uacg.bg
Marital Status widower

Education

PhD Bridge Engineering
Graduation 1982
Higher Institute of Civil Engineering
M.Sc. of Civil Engineering
Graduation 1968
Higher Institute of Civil Engineering

Language Skills

English
Russian
French
Turkish

Membership

Member of IABSE
Member of the Bulgarian Chamber of Design Engineers

Participation in Design Projects

Period 1975 - 2000
Viaduct at km 26+850 of the “Hemus” highway.
60m+4x72.5m+60m, Steel plate girder bridge
Viaduct at km 27+500 of the “Hemus” highway.
100m+162m+100m, Steel box girder bridge
Road bridge across Iskar river near Chomakovci village.
3x40m, Composite bridge
Railroad bridge across Davidkovska river near Davidkovo village.
32m+40m+32m, Steel bridge
Two railroad bridges for Iran.
2x50m and 56m+70m+56m Curved plate girder bridge
Road bridge across the Kremikovtzi railroad station.
30m+3x40m+30m. Composite bridge
Pedestrian bridge across the Stroumiani railroad station.
21m+18m+30m+9m. Steel truss bridge
Movable needle scaffold for concreting of road bridge across Veleka river.
Pedestrian bridge near the town of Tuapse, Russia.
30m+25m+30m. Steel truss bridge
Bridge-slipway for boats near the town of Tuapse, Russia.
17m+18m Cantilever composite bridge
Pipeline suspension bridge across the Yantra river near the town of V.Turnovo.
Lmax=96m
National palace of culture.
Machine shop for the heavy mechanical engineering plant in the town of Russe.
Span=40m
Trestles for the heavy mechanical engineering plant in the town of Radomir.
Truss girder
Reconstruction of the trolleybus depot in the town of Plovdiv.
Span 42m
Bunker gantry for cooper mining production plant at the town of Pirdop.
2x30m
Period 2000 - 2006
Pedestrian suspension bridge across the Varbitza river near the town of Momchilgrad. Lmax=155m; Total length 270m
Reconstruction of a truss bridge across the Maritza river at km 40+000 of the road III-807. L=5x41m. Steel truss bridge
Reconstruction of the cable-stayed pedestrian bridge across the Iskar river in the town of Samokov. L = 60m
Reconstruction of the Sofia central railroad station square. Design of the membrane shed.
Structural design projects for a number of residential houses and other structures.

Publications

Publication – more than 50 articles and 5 books:
-Steel Bridges 1st and 2nd edition (2000; 2006)
-Composite Bridges – design guidance (2003)
-Steel Bridges - design guidance (1976; 1990)
And 3 books in the University website:
-Diagnostics and reparing of bridges
-Composite Bridges
-Timber Bridges

Books

Дървени мостове - лекции
проф. д-р Е.Дулевски

Дървени мостове - лекции
проф. д-р Е.Дулевски

Дървени мостове - лекции
проф. д-р Е.Дулевски

Дървени мостове - лекции
проф. д-р Е.Дулевски

Дървени мостове - лекции
проф. д-р Е.Дулевски

Дървени мостове - лекции
проф. д-р Е.Дулевски


Комбинирани мостове – 2015 г. – Част II-ра
Проф. д-р инж. Енчо Дулевски

Комбинирани мостове – 2015 г. – Част III-та
Проф. д-р инж. Енчо Дулевски

Комбинирани мостове – 2015 г. – Част IV-та
Проф. д-р инж. Енчо Дулевски

Комбинирани мостове – 2015 г. – Част V-та
Проф. д-р инж. Енчо Дулевски